UST Safety standards start before construction even begins. During design, we identify site-specific risks and build mitigation into the execution plan. We model our safety program after OSHA and Army Corps of Engineers EM385-1-1 standards.

Safety is foundational to how we design and build every project. Your GC needs a partner who takes this seriously from the beginning.

Our Commitment

Safety planning happens before and during
design assist, not simply on day one of installation.
Our crews maintain OSHA 10 and 30-hour certifications.
We actively encourage a culture of safety with daily on-site safety meetings, monthly safety committees meetings and training focused on awareness.
Our team has expertise in confined space entry, pressurized systems, energized work, and hazardous materials handling.
We audit work regularly and track near-misses to catch issues early.
Four workers in helmets and safety gear inspecting and testing industrial pipes and valves outdoors.Industrial pipes with gauges and lights beside safety gear, clipboard, and electrical testing tools on a metal table.Industrial pipeline with pressure gauge, valve secured by lockout tags, blue hose, and a tool case outdoors.Industrial room with blue machinery and metal pipes along a concrete floor and wall.

Experts in Federal, State, and Local Requirements


Fuel infrastructure must meet EPA Underground Storage Tank regulations, EPA Spill Prevention Control and Countermeasure, and OSHA safety codes. Industry standards include UL-142, UL-2085, NFPA 30, NFPA 110. And Petroleum Equipment Institute (PEI) Recommended Practices such as PEI RP 1400.

We follow Army Corps EM385-1-1 to handle project-specific safety requirements. Each state and locality adds fire marshal approval, air permits, and AHJ sign-offs.

Validated Before Operations Begin

We've completed over 60 data center projects with complex fuel systems. Multi-level commissioning validates that systems meet specification and pass final inspection. We deliver systems that work for Tier III and Tier IV data centers.